Nersa’s approval of curtailment rules expected to unlock wind projects in Eastern and Western Cape | PlaneteAfrique Afrique du Sud
PlaneteAfrique
Déconnexion


Nersa’s approval of curtailment rules expected to unlock wind projects in Eastern and Western Cape

Nersa’s approval of curtailment rules expected to unlock wind projects in Eastern and Western Cape
The National Energy Regulator of South Africa (Nersa) says the decision by the Energy Regulator to approve a curtailment framework will help unlock scarce grid connection capacity for wind projects in the Eastern Cape and Western Cape.

The approval was made by the Energy Regulator, Nersa’s highest decision-making structure, on April 29.

The decision arose from its adjudication of an application by the National Transmission Company South Africa (NTCSA) for congestion curtailment to be classified as a constrained generation ancillary service.

The NTCSA has indicated previously that, by accepting a reasonable share of no more than 10% of curtailment, 3 470 MW of additional grid capacity to connect wind generation could be made available, including 2 680 MW in the Western Cape and 790 MW in the Eastern Cape.

The absence of an approved framework came to the fore during the sixth bidding round under South Africa’s public renewables procurement programme. This, after none of the wind projects vying for a 3 200 MW allocation advanced to preferred-bidder stage after Eskom indicated that the grid capacity in the Eastern, Northern and Western Cape provinces had been fully absorbed.

The outcome led to significant debate about why a mechanism such as curtailment, which is used by system operators globally, was not being employed to maximise available grid capacity at a time when new generation was sorely needed.

Eskom then published a curtailment addendum to its Generation Connection Capacity Assessment and, subsequently, the NTCSA, which is now an independent subsidiary of Eskom, made an application to Nersa to seek approval for the curtailment framework.

Nersa explained in a statement that congestion curtailment meant that the amount of active power that a generating facility was permitted to generate was restricted by the system when there was grid congestion.

The approval is effective from April 1, 2025, to March 31, 2028, and allows generators that incur financial losses as a result of congestion curtailment to receive compensation.

However, such compensation is limited to the allowable revenue approved under the sixth multiyear price determination, or MYPD6, for the line item relating to ancillary services and energy imbalances.

Its use is also restricted to facilitating additional wind generation capacity in the Eastern Cape and Western Cape regions, with any additional grid connection capacity unlocked through congestion curtailment requiring the approval of the Energy Regulator.

“The NTCSA must address other forms of curtailment in accordance with the existing grid unavailability provisions outlined in the power purchase agreements or connection agreements.

“Therefore, curtailment required for over-frequency control (resulting from low demand) will continue to be treated as it is treated currently,” Nersa said in a statement.

The regulator also announced that the NTCSA would be compelled to report to the Energy Regulator on the implementation of congestion curtailment every six months over the three-year period.

“The report should cover, at a minimum, information on the capacity connected to the grid through this regime, curtailment level implemented, records of the curtailment incidents, costs, progress on systems and ancillary service projects.”

Nersa said the conditions were aimed at protecting consumers from potential cost escalations associated with unmanaged curtailment, while also incentivising the NTCSA to accelerate transmission projects and promoting a supportive environment for new renewables investment.

“Through this decision, the Energy Regulator has taken a decisive step in facilitating investment in cleaner energy and supporting the integration of renewable energy into the national grid,” Nersa added.

Publicateurs
Devenez publicateur Partagez votre voix Racontez l'Afrique qui bouge

Touchez plus de 0 milliard d'Africains

Devenir publicateur →
Partager Partager

À lire aussi

AFRIQUE DU SUD
Here is what the weather has in store for KZN, the Free State, and the North West on Sunday 27 Septe...
9/27/2026 2:05:00 AM -  284
AFRIQUE DU SUD
A 48-year-old man appeared before the Temba Magistrates’ Court on Friday in connection with a busine...
9/27/2026 2:03:00 AM -  123
AFRIQUE DU SUD
Eskom chairperson Dr Mteto Nyati, whose term has been extended by a further three years, says the bo...
9/27/2026 2:01:00 AM -  111
AFRIQUE DU SUD
The Southern African Institute of Steel Construction (SAISC) has confirmed that its fabricating memb...
9/24/2026 9:36:00 AM -  176
AFRIQUE DU SUD
Alison Botha, the South African woman who was kidnapped, brutally raped and disembowelled in an atta...
9/20/2026 2:03:00 AM -  433
AFRIQUE DU SUD
The Springboks beat the All Blacks 43-28 in Baltimore on Saturday to secure an intense 3-1 series wi...
9/13/2026 2:03:00 AM -  420
AFRIQUE DU SUD
All Blacks captain Ardie Savea has brushed off claims that South Africa is a “dangerous”...
9/6/2026 2:03:00 AM -  458
AFRIQUE DU SUD
Struggling to decide what to wear? Here’s what today’s weather has in store for South Africa’s nine ...
8/30/2026 2:03:00 AM -  490
AFRIQUE DU SUD
Ellis Park witnessed history in the making as Airlink performed its first double flyover to mark the...
8/23/2026 2:04:00 AM -  619
AFRIQUE DU SUD
On 12 August, Siviwe Gwarube, the Minister of Basic Education, pleasantly surprised her long-serving...
8/16/2026 2:04:00 AM -  665
AFRIQUE DU SUD
Mamelodi Sundowns head coach Miguel Cardoso has confirmed that Monnapule Saleng is currently trainin...
8/9/2026 2:04:00 AM -  566
AFRIQUE DU SUD
Steve Hofmeyr’s lookalike son, Devon Hofmeyr, has married his longtime partner, Nikita, in a picture...
8/2/2026 2:04:00 AM -  666
 

Actualités par pays

 
 
 
 

Actualités par pays

Newsletter


 
 
 
 
 
MySite
WS-MYSITE
✨ Présence web
Créez votre site clé en main
Démarrer →